Electric / Pneumatic Intrinsically Safe ISP5 Positioner
ISP5 is a 2-wire
positioner, which requires a 4-20mA signal input, which is suitable for linear pneumatic actuators. The
positioner compares the input electric signal from the
controller with the feedback signal of the stroke position of the control valve, and outputs different air pressure signals to the actuator according to the comparison result. For the output signal of any
controller, the position of the valve can be guaranteed, and it can overcome the influence of the pressure difference of the valve, the friction of the valve stem and the change of the diaphragm damping. According to the NAMUR standard, whether it is pillar-mounted or yoke-mounted, mounting accessories are provided with each
positioner, and a safety cover is also provided.
Some products and services are only available in certain regions.
Introduction to the Spirax Sarco ISP5 locator
The EP5
positioner is a two-wire loop-powered
positioner that requires a 4-20mA control signal for linear pneumatic valve actuators. The
positioner compares the signal from the
controller with the actual position of the valve and changes the pneumatic output signal of the actuator accordingly. It can maintain the required valve position for any control signal, and at the same time can overcome the effects of changes in pressure difference, valve stem friction and hysteresis. The mounting kit provided with this
positioner complies with pillar or yoke mounting according to NAMUR standard.
How does the Spirax Sarco ISP5
positioner work?
The work of Spirax Sarco EP5 is based on the principle of balance of forces, which is achieved by a nozzle / baffle mechanism and a feedback spring. The electrical signal from the
controller is converted into a proportional pressure signal. The pressure signal acts on the baffle through the receiver, causing the position of the baffle relative to the nozzles U1 / U2 to change. The decompression bleed air from the air source is supplied to the amplification relay, and is also supplied to one of the nozzles U1 / U2. The pressure drop due to the movement of the baffle through the nozzle is sensed by the amplification relay. The amplification relay outputs a signal proportional to the pressure drop across the nozzle to the actuator. Due to the movement of the actuator, the lever connected to it causes a change in the tension of the feedback spring. This tension acts on the baffle to move it to a new position, where the force generated by the spring and the applied pressure signal are balanced.
Spirax Sarco ISP5 Locator Safety Information
The trouble-free and safe operation of EP5 and ISP5
positioners depends on proper transportation, storage / installation and commissioning, proper use and careful maintenance by qualified personnel.
Please read Spirax Sarco's general manual IM-GCM-10. Before installing / using / maintaining the
positioner, consider the following:
working environment
aisle
illumination
Danger of fluids in pipes
temperature
System isolation
Spirax Sarco ISP5 Positioner Ordering Instructions
Example: 1-Electric / Pneumatic Spirax Sarco EP5 Positioner
Professional manufacturing and professional services, KUNAG creates more value for you
Continuously improving the quality of services and keeping improving, "sincere service" is the eternal theme of KUNAG. Kunag strictly complies with the requirements of ISO9001-2000 quality system certification, strictly controls the quality and responsibilities to the people to ensure the healthy operation of production, sales and service. To strengthen communication with customers and to provide our customers with quality products and perfect service, we hereby make the following commitments:
Product Standards
Products are designed, manufactured, and inspected strictly in accordance with China\'s GB, HG standards, and US API standards. The hardness of the sealing surface meets the national requirements and the width exceeds the national standard.
pre-sale service
Product introduction, technical communication, non-standard product design, troubleshooting.
Sale service
Trustworthy contracts, guarantee timely delivery, and keep in touch with customers at any time.
For special or complex products, our factory arranges technicians to train and guide users on product use, troubleshooting, tuning and maintenance.
After sales service
The warranty period of Weitong products is 12 months from the factory, and the "three guarantees" service (return, replacement, repair) is implemented.
During the use of our products, our factory regularly organizes technical and inspection personnel to visit and solicit user feedback on product quality, use conditions, and improvement opinions in order to further improve product quality.
Quickly respond to customer complaints about product quality problems, and after-sales service personnel rushed to the scene within 24-36 hours (48 hours outside the province).
For after-sales service, users are required to fill in the quality feedback form after the service and make appraisal opinions, while improving Guardian\'s service quality.
Order process
Landline: 021-59718851 (AM-8: 30 to PM-17: 30)
Mobile phone: 18918462396 (WeChat same number 24-hour service)
QQ: 2030185432
Email: kunage@126.com
Receive customer purchase list, provide customers with valve model selection and quotation (price list).
Specific agreement: delivery time, special requirements, etc.
download Google:
Customers have special requirements for products, and must provide the following instructions in the order contract:
(1) Structure length;
(2) Connection form;
(3) Nominal diameter, full diameter, reduced diameter, pipe size;
(4) Operating medium, temperature and pressure range;
(5) Experiment, inspection standards and other requirements;
(6) Various driving devices can be configured in this field according to the special requirements of customers;
If the determined valve type and model are provided by the customer, the customer should correctly explain the meaning and requirements of its model, and sign the contract under the conditions that the supply and demand sides understand and agree.