Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

Industry new

How to test the valve for leak test

The basic steps of valve pressure test leak test:
     1. Open the valve passage, fill the valve cavity with water (or kerosene), and increase the pressure required for the strength test to check the valve body, valve cover, gasket and packing for leakage.
2. Close the dead valve path, pressurize the valve to the nominal pressure, and check for leaks from the other side.
3. Turn the valve upside down and test the opposite side.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code