Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language:
∷
Industry new
Daily maintenance and use of the assembly line
1. Brief operation of electrical equipment in the assembly line: The power supply of the pipeline needs three-phase four-wire, and there is one main switch on the outside. (Three-phase four-wire four-pole switch can be used. It can also be used to control only three-phase power supply. The zero line is direct, and the second connection is not allowed. The line also passes another switch). N of the distribution box is connected to the neutral line, A, B, C are connected to the three-phase power supply of the power supply, U, V, W are connected to the motor, and 3, 4 are connected to the speed control motor F1, F2. 5, 6, 7 connected to the speed control motor u, v, w. 2. The method of starting the motor by the pipeline Turn on the power first, then all three power indicators will be on, proving that the three-phase power has arrived at the distribution box. At this point, you can press the blue button of the motor to start the motor. If it can't be started, you can open the power distribution box door and see if the second DZ108 switch in the first row is red long and blue short. If you don't press this blue down. After the motor starts, then turn on the switch of the pipeline speed controller, and then slowly adjust the potentiometer of the speedometer to express the speed to the desired speed. When shutting down, first adjust the potentiometer of the speed control meter to zero slowly, then turn off the switch of the speed control table, and then press the red button of the electric mechanism to stop the motor. Finally, the main switch is turned off. 3, the pipeline fluorescent lamp starts Press the blue button of the light to activate the fluorescent light, and then press the red button of the red light to stop the fluorescent light. If the daylight does not illuminate, check that the flat switch on the fluorescent lamp bracket is open at the 1 position. Finally check the third in the first row, whether the fourth DZ47 is in the open position. In general, Wu Xing will install a switch for each station during the installation process for the customer, which is convenient for employees to work. It is also beneficial to energy savings when used.