Industry new
Stacked solenoid valve installation instructions
The electromagnetic valve type of installation is currently used mainly superimposed type, there are many other methods, such as: plate type, embedded with the tube type. The above three kinds of infrequent installation methods are different in various forms, so the requirements and other conditions are also different. The following describes the stacking method, etc.
I. Precautions before installation:
1, check whether the certificate, instructions and spare parts are complete
2, check whether there is poor packaging, damage or foreign matter
3, check whether the port is open
4, the best use of kerosene cleaning before installation
5, do not connect the wrong port (general component ports have text or code designation)
6, we must pay attention to the cam or Tan block of travel and the distance between the valve Bo paradise, so as not to crash during the test
7, when the flange is used to install the connecting element, the connecting screw must be screwed properly.
8, some of the valve parts open to facilitate the manufacture and installation of holes, the useless holes should be blocked after installation.
9. Some valve parts can not be purchased during installation, allowing the use of hydraulic valve parts whose flow exceeds the rated flow rate by 40%.
Second, the characteristics of the stacking electromagnetic valve installation:
1, eliminating the link between the valve and the valve
2, system assembly is flexible, centralized, compact
3, easy to improve the oil circuit