Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

brand information

Five major notes on turbine flowmeter installation instructions

5 major considerations for turbine flowmeter pipe installation

1. The sensor should be installed in a place that is easy to maintain, no vibration of the pipeline, no strong electromagnetic interference and thermal radiation;

2, horizontal installation of the sensor requires that the pipeline should not have a visually detectable tilt (usually within 5 °), the vertical deviation of the vertical installation sensor pipeline should also be less than 5 °. In places where it is not possible to stay, the shut-off valve of the bypass pipe shall be installed, and the bypass pipe shall be ensured without leakage during the measurement;

3. In the newly laid pipeline installation sensor, first connect a short tube to replace the sensor. After the “sweep line” is completed, confirm that the pipeline is cleaned and the sensor is officially installed.

4. If the fluid contains impurities, the filter should be installed on the upstream side of the sensor. The pipeline should be cleaned and discharged regularly. If the liquid to be tested contains gas, a side-mounted air eliminator should be installed upstream of the sensor. The drain and air vents of the filter and air eliminator should lead to a safe place;

5. When the sensor is installed outdoors, measures should be taken to avoid direct sunlight and prevent rain.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code