Electromagnetic flowmeter installation location selection instructions
Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

Industry new

Electromagnetic flowmeter installation location selection instructions

The choice of electromagnetic flowmeter installation location:
In order to make the transmitter work stably, the electromagnetic flowmeter should pay attention to the following requirements when selecting the installation location:
1) Try to avoid ferromagnetic objects and equipment with strong electromagnetic fields (such as large motors, large transformers, etc.) to prevent the magnetic field from affecting the working magnetic field and flow information of the sensor.
2) It should be installed in a dry and ventilated place as much as possible. It should not be installed in a place with damp or water accumulation.
3) Try to avoid sun and rain, avoid ambient temperature above 45 ° C and relative humidity greater than 95%
4) Choose a place that is convenient for maintenance and convenient for activities
5) The flowmeter should be installed at the rear end of the pump and must never be installed on the suction side; the valve should be installed on the downstream side of the flowmeter.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code