Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

Industry new

How to install the ultrasonic flowmeter correctly

1. Observe whether the installation site pipeline meets the 5D after 10D in the straight pipe section and the distance from the pump 30D. (D is the inner diameter of the pipe)

2. Confirm the fluid medium in the ultrasonic flowmeter pipe and whether it is full.

3. Confirm the material of the pipe and the wall thickness (taking into account the scale of the inner wall of the pipe).

4. Confirm the service life of the pipeline. After using the pipeline for 10 years or so, even if it is made of carbon steel, the plug-in installation is also adopted.

5. After the first four steps are completed, you can confirm which sensor is installed.

6. Start entering parameters into the body to determine the installation distance.

7, very important: ****** test the installation distance.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code