Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language:
∷
Industry new
Precautions for installation of high pressure solenoid valve
When installing high pressure solenoid valve, some points should be paid attention to: 1, before installation, refer to the instruction manual of the product, whether it meets your requirements. 2. Piping should be rinsed before use. Filters should be installed if the media are not clean, so as to prevent impurities from hindering the normal operation of solenoid valves. 3, after a long time, the solenoid valve should be cleared after setting up the condensate. It is easy to use. When it is removed and cleaned, the parts should be put in order and installed again. 4, solenoid valve is generally one-way, can not be installed, the arrow on the valve is the direction of movement of pipeline fluid, must be consistent. 5. Solenoid valve should be treated heat-treatment or set up insulation measures when icy places are re worked. 6, solenoid valve installation general body level, the coil vertical upward, some products can be installed at any time, but when conditions permit, it is best to vertical, in order to increase the service life. 7, after the connection of the electromagnetic coil lead wire (connector) is confirmed, it should be confirmed whether it is strong, and the contact points of the electrical components should not be jitters. Loosening will cause the solenoid valve not to work. Continuous production of solenoid valve, it is best to use bypass, easy to repair, do not affect production.