Remedy for leakage of stainless steel metal hose joints - focus on microfluidic control technology
Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

News

Remedy for leakage of stainless steel metal hose joints - focus on microfluidic control technology

Any product has a service life and shelf life. Stainless steel metal hose joints are no exception. After long-term wear and tear, leakage may occur. How to take effective measures to remedy in time may cause series production and safety problems.
 
When it is found that the stainless steel metal hose connector leaks, it is recommended to take the following measures for remedial treatment:
 
1. Replace all metal hoses for the extraction of synthetic water tanks;
 
2. Replace all parts and materials that have been in contact with the media, including flanges, metal joints, etc.;
 
3. Before adjusting the installation position of the original gate valve on the tank to the metal hose, once the metal hose has a problem, the valve can be cut off to avoid a large amount of leakage of the medium in the tank; and even if the metal hose joint leaks again, it is convenient to replace quickly. To minimize the impact on production and safety.
 
 
Precautions to avoid leakage of metal hose connectors:
 
        In order to make the metal hose function normally during use, in addition to taking remedial measures when leaks are found, it is necessary to strengthen preventive measures to avoid leakage as much as possible. The metal hose connector official website Xiaobian proposed the following suggestions to the staff:
 
1. Before selecting the model, the designer needs to understand the medium flowing through the metal hose, including the composition and corrosiveness of the medium, correctly select the parts and materials of the overcurrent part, and put forward corresponding technical requirements to avoid the occurrence of galvanic corrosion.
 
2. After the application, the inspection of the metal hose joints of important parts should be strengthened, and the changes of the process medium should be closely monitored. Once the process medium indicators related to corrosion change, such as the increase of conductivity and the decrease of pH, it should be confirmed in time. Whether metal hoses and joints can meet existing process requirements and take necessary precautions in a timely manner.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code