The industry believes that in addition to opening up overseas markets, it should also move toward higher steel pipes, because the current domestic production capacity is far from meeting the demand, and the demand for high-end welded steel pipes represented by oil and gas pipes is huge in the next few years. The specific basis is three: 1. Oil and gas pipelines. During the 12th Five-Year Plan period, the total length of domestic oil and gas pipelines will reach 200,000 kilometers, that is, the annual new oil and gas pipeline production line will be more than 15,000 kilometers, and the corresponding oil and gas pipeline demand will be 10 million tons. Second, the power grid, the "Twelfth Five-Year Plan", the national grid UHV transmission lines will reach more than 11,000 kilometers, corresponding to high-end welded steel pipe demand of about 6-8 million tons. Third, offshore wind power pile driving pipe, during the "Twelfth Five-Year Plan", offshore wind power by the end of 2015, to achieve the national offshore wind power production of 5GW, the goal of 5GW under construction; corresponding high-end welded steel pipe demand more than 2 million tons.
Contact: peng gong
Phone: 18918462396
Tel: 021-59718851
Email: kunage@126.com
Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai