Welcome: KUNAG Fluid Control System (Shanghai) Co., Ltd.
Language: Chinese ∷  English
Search

brand information

Steam solenoid valve use maintenance tips to introduce

Steam solenoid valve use maintenance tips:

1. When the steam solenoid valve is removed from the pipeline, the internal parts should be wiped clean and stored with compressed air.

2. When the use time is long, if the seal between the piston and the valve seat is not good, the piston sealing surface can be re-polished and then grinded with the valve seat.

3. When working, pay attention to the pressure gauge before and after the valve, the working pressure should not exceed the rated pressure, and the working pressure difference must be within the rated pressure difference. When the work pressure exceeds the amount

When the constant pressure or working pressure difference exceeds the rated pressure difference, the steam solenoid valve should be stopped, and the front and rear manual valves should be closed to prevent the steam solenoid valve from exploding and leaking.

4. The dirt inside and outside the large valve and the suction surface should be cleaned regularly, taking care not to damage the sealing surface.

5. When the steam solenoid valve is not used for a long time, the manual valve before the valve should be closed. When re-enabling, the steam steam solenoid valve should remove the condensate and make several trials.

It can be put into use after the switch is normal.

6, it is recommended to use the unit to send someone to take care of the use of maintenance.

7. After the steam solenoid valve is installed, it is necessary to pass the medium experiment action several times. After confirming the normal, it can be put into formal use.

CONTACT US

Contact: peng gong

Phone: 18918462396

Tel: 021-59718851

Email: kunage@126.com

Add: Lane 819, Qinghewan Road, Qingpu Industrial Park, Qingpu District, Shanghai

Scan the qr codeClose
the qr code